The project involves the construction of four warehouses in Khalifa Industrial Zone Abu Dhabi (KIZAD), Abu Dhabi. The warehouses with over 80,000 sq m of capacity, KLP21 will be one of the largest and the most advanced temperature-controlled logistics hubs in the region. Combined, the warehouses will be able to accommodate over 100,000 pallets across a network of chambers that can be independently configured to a range of sizes and temperatures, including -26°C to 25°C.

  • Project Category:

    INDUSTRIAL/AGRICULTURAL
  • Location:

    Abu Dhabi
  • Company:

    Trojan General Contracting LLC
  • Client:

    Abu Dhabi Ports (ADPC)
  • Consultant:

    25 Months

projects of similar category